Skip to main content
ValidationV0
5

V0 seeded-state boundary: local demonstration data only. No live Sentinel, Augustus, Prism, Foundry or Depot synchronization; no electronic-signature, Part 11 or Annex 11 claim.

Documented qualitative assessment

Low-complexity, well-bounded matters where narrative justification is proportionate.

Probability-impact assessment

Operational decisions requiring consistent severity and likelihood ranking.

Risk ranking and filtering

Prioritising inventory, periodic review or qualification activity.

FMEA / FMECA

Complex systems or process failure modes where structured control analysis is justified.

HACCP

Process hazards with defined control points and monitoring.

Fault-tree analysis

Top-event analysis requiring causal decomposition.

Preliminary hazard analysis

Early lifecycle scoping before detailed design information is available.